Sweetheart Lacy Cowl pages 22-23
Updated: 12Dec2013
In row 15 of the chart, the indicated sssk should be worked as ssk.
Easter Egg Toppers, page 35
Updated: 08Aug2014
Correction is underlined.
2-st RT Sl 1 st to cn and hold to back, k1, k1 from cn.
Mother’s Day Ruffled Scarf, page 48
Updated: 15Jan2020
Correction is underlined.
Row 65 Work as row 61.
Emerald Isle Lap Blanket
Updated: 09Apr2014
Chart 3, row 11, stitches 21–24 — the symbol should be a 4-st RPC.
Sweet and Slouchy Hat, pages 58–61
Updated: 08Nov2013
1. The center cable in the chart rep on rounds 1, 3, 5 and 7 should be the 4-st RC. The 5-st RPC is worked in the rounds after the increase in round 8.
In round 8 the double increase should be replaced by a single increase, worked by knitting into the front and back of the stitch.
2. A corrected chart and stitch key is available. [PDF 68KB]
Star Spangled Bunting, page 81
Updated: 09Apr2014
Correction is underlined.
Stars
Row 4 K2, *dcd, k4; rep from * to last 5 sts, dcd, k2.
Thanksgiving Throw, page 110
Updated: 20Aug2022
Correction is underlined.
BLANKET
1ST STRIP
With A, cast on 74 sts.