Search
0
$0.00
0 items

No products in the cart.

ISBN-13: 978-1-936096-68-8

Tudor Lace, page 23

Updated: 15May2014 

Correction is underlined.

Preparation row (WS) [P1, k1] twice, *p5, MB, p4; rep from * to last 5 sts, p1, [k1, p1] twice.

The chart is correct.

Cable Fringe Scarf, pages 55 and 56

Updated: 01Mar2011 

Stitch Key

1. pg 55 STITCH GLOSSARY
The following definition was omitted –
4-st LC Sl next 2 sts to cn and hold in front, k2, k2 from cn.
Click here to download the corrected chart. [16KB PDF]

Silver Anniversary, page 101

1. Swarovski crystals used are size 8mm, not 15mm. 

2. Yarn amounts are incorrect. 2 hanks of #09m pewter are needed. 1 hank of all other colors is adequate.

Initial Signature, page 122

Updated: 11Mar2009 

STITCH GLOSSARY
Seed st (over an odd number of sts)
Row 1(RS) K1, *p1, k1; rep from * to end.
Rep row 1.

Shawl-Collar Cable Point, page 127

Corrections are underlined

1. MATERIALS
6 1 3/4oz/50g balls (each approx 110ys/99m) of Schulana/Skacel Collection Tweed-Lux (wool/silk/cashmere) in #6 brown

2. The skill level is EXPERIENCED

3. See corrected chart [PDF 73K]

4. RIGHT SIDE
With smaller needles, cast on 71 sts.
Ribbing
Row 1 (RS) Work 35 sts in k1, p1 rib, S2KP (pm on this st), work 33 sts in k1, p1 rib.
Cont in pat as written until row 3 has been worked final time – 59 sts.
Beg with preparation row, work until row 60 of chart has been completed, then rep rows 31-36 for cables, slip sts and seed sts, AND rep rows 29-60 for center motif only, until piece measures 16″/40.5cm, end with a WS row.
Beg dec at neck edge (beg RS rows) only as folls: Continue in pat as written until right side sts are placed on holder.

LEFT SIDE
Cast on as for right side.
Ribbing
Row 1 (RS) Work 33 sts in k1, p1 rib, S2KP (pm on this st), work 35 sts in k1,p1 rib. Cont in rib as for right side-59 sts.
Preparation row (WS) P1, [k1, p1] 4 times, p1, k2, p6, k2, p1, k7, p5, k2, turn. Cont same as right side, reversing shaping.

Print Friendly, PDF & Email